Grouped by topic — quotation and payment, choosing the machine, customization, accuracy, export packing and service — the answers below are the ones that decide a machine tool purchase.
How a price is built, what the smallest order is, and when money moves.
Send the machine family you are comparing, or the part drawing with material, batch size and tolerance, plus the destination port. You receive a configuration sheet and a price on the agreed Incoterm. If the part needs a different spindle, travel or fixturing, that is settled before the price is fixed. Start from the machine range.
One unit. Single machines for workshops and bulk orders for distributors are both handled, and nothing forces a second machine onto a first order.
T/T with 30% deposit for production and 70% balance before shipment. L/C is negotiable on large orders.
15 to 30 working days for standard models and 35 to 60 working days for custom-modified machines. The schedule is confirmed on the proforma invoice rather than on a web page.
Four families, one question: which configuration removes the operation your part does not need.
Horizontal lathes for shaft-type parts; turning-milling centers for parts that need milling and cross holes in the same clamping; vertical machining centers for plates, frames and housings; drilling-tapping centers for small holes at high spindle speed. The industry pages map all four to six sectors.
A vertical Y-axis lets the turret mill off-centre features such as flats, slots and cross holes without a second operation. On the TX500LY, TX680LY and TX680LIY the Y-axis travel is 100 mm, with driven tools on a BMT turret.
When both ends of a part are machined and the batch repeats. The TST46L and CWS46L machine front and back in one cycle on two spindles, so the second operation and the handling between them disappear. Below that batch size a single-spindle lathe is usually the cheaper route.
The T700L drilling and tapping center: 20,000 rpm BT30 spindle, 21-tool servo magazine and 700 × 400 × 340 mm travels. It is designed for tap density rather than for heavy milling.
What can be changed before the machine is built, and by whom the specification is owned.
Yes. Spindle, tool magazine, travel, fixture and control options are set against the material, drawing and tolerance you send. Tooling and fixturing are agreed before the machine is built, so the unit that ships is the one that was specified.
Yes. Tell us which part of the specification you want to control and it is written into the order, so the boundary is clear before production starts.
FANUC, SYNTEC and GSK, selected per model and per order. Each model page lists controller, spindle, turret and travel side by side.
How the numbers on the parameter table are produced, and what you can insist on before the machine ships.
Three checks are made on the machine that will ship: laser interferometer calibration of positioning and repeatability — typically ±0.005 mm positioning and ±0.003 mm repeatability on the X and Z axes — a ball-bar circular test of the interpolation path, and a trial cut on real material. The positioning test follows the ISO 230 method.
Yes, on site at the factory or by video if travel is not practical. A factory visit and a virtual tour can both be arranged before shipment.
Machine positioning accuracy is the starting point, not the part tolerance: fixture rigidity, tool runout, material and thermal behaviour decide the rest. Send the drawing with the critical dimensions and the answer comes back as a configuration.
Treat the model page as the specification you are buying and quote the figures you rely on in the order. Where a published value and the value you need diverge, it is settled in the configuration sheet before production.
What the machine travels in, which papers clear it, and where risk changes hands.
In fumigated or fumigation-free export wooden cases. Solid-wood cases are heat treated at 56 °C for at least 30 continuous minutes and carry the IPPC mark under ISPM 15; cases made wholly of plywood or other processed board are exempt from treatment.
Commercial invoice, packing list and bill of lading. A certificate of origin is issued on request, either the ordinary certificate used for customs clearance or a preferential one where the destination qualifies under a trade agreement.
EXW, FOB or CIF, always named with the place — FOB Guangzhou, CIF Alexandria. Risk passes where each rule defines it: at your premises for EXW, on board at the port of shipment for FOB and CIF. Under CIF the default cargo cover is Institute Cargo Clauses (C), with wider cover arranged on request.
Phase and voltage of the main supply, control-circuit voltage, frequency for 60 Hz markets, and the plug or terminal standard used on site. For the EU, also state whether CE marking is required at your plant, because that changes the electrical design of the machine.
What happens after commissioning, and who is behind the nameplate.
One year on the whole machine, with remote technical support available from the day it is installed.
Remote technical support, the operation manual and video guidance come with every machine, and the same channel is used for troubleshooting after installation.
Yes. Spare parts are supplied as a standing service: send the machine model, the serial number and the part you need, and the match is confirmed against the build record.
A factory. Machines are assembled, calibrated and tested in our own workshop in Panyu, Guangzhou, with the lathe base in Xingning, Meizhou — around 100,000 m² in total and 6,000+ machines a year. A visit or a virtual tour can be arranged before you order. More in About JIAMENS.
Headquarters and the machining-center base are in Panyu, Guangzhou; the lathe base is in Xingning, Meizhou. Visits are arranged through the contact page, at the plant that builds the model you are considering.